4虎影院在线观看-4虎在线-成人性生活视频-成人性生交大免费看-黄色av一级片-黄色av一区-免费精品久久-免费精品视频-日韩 国产 欧美-日韩 国产 在线-午夜啪视频-午夜琪琪-在线免费三级-在线免费色-一区二区三区高清日本vr-中国偷拍老肥熟露脸视频

400-0302-595
安貝斯控制臺(tái)
首頁(yè) > Industry hotspots
Anlps supports Shaoxing converter station
Time:2022-04-13 14:16:16Source:Anlpsorder

Recently, the Shaoxing converter station completed its 6th annual comprehensive maintenance, laying a solid foundation for ensuring power supply during this summer's peak electricity consumption period in Zhejiang and the Hangzhou Asian Games.

Zhejiang is a province with high energy consumption and low resources, and foreign electricity accounts for more than one-third of the highest load in the province. Adding to the key tasks of ensuring electricity supply during the Hangzhou Asian Games and summer peak season, the task of ensuring electricity supply in Zhejiang this summer has become even more challenging. In this annual maintenance, State Grid Zhejiang Ultra High Voltage Company, based on daily operation and maintenance experience and anti accident measures investigation, carried out maintenance on new equipment such as converter transformer lifting seats installed in Shaoxing converter station in recent years. The operation and maintenance personnel of State Grid Zhejiang Ultra High Voltage Company have installed 70 visible light cameras in the DC field and AC filter field, and connected them to the panoramic video fusion system of the converter station to improve the information perception ability of the system. The panoramic video fusion system initially has four functions: self perception and digital expression, equipment status analysis and diagnosis, accident response, and intelligent control, which can help improve the efficiency of operation and inspection.

The Shaoxing converter station is a ± 800 kV Lingshao DC receiving end converter station, which was put into operation in August 2016. The project starts from Lingzhou Converter Station in Yinchuan, Ningxia, passes through 6 provinces (regions), and ends at Shaoxing Converter Station in Zhuji, Zhejiang. The total length of the line is 1720 kilometers. As the main artery of the "West East Power Transmission", the Lingshao DC project has maintained stable operation with a large load of 7200 megawatts for a long time, continuously sending wind and solar power from thousands of miles away from the Ningxia energy base to Zhejiang, with a maximum daily power transmission of 160 million kilowatt hours, making the vision of "coal flowing from the air and electricity coming from afar" a reality.

As one of the first pilot projects for digital converter stations in China, State Grid Zhejiang Electric Power has applied new technologies such as the Internet of Things, artificial intelligence, 3D modeling, and Beidou positioning at the Shaoxing converter station, integrating automated collection of equipment monitoring data to achieve remote intelligent inspection of equipment, centralized monitoring of data, and automatic push of fault handling strategies. The application of new technologies has enhanced the ability of operation and inspection personnel to control equipment, ensuring the long-term safe and stable operation of the converter station.

安貝斯

Based on the concept of the "West East Power Transmission" main artery of Shaoxing converter station, and in combination with the analysis of the informationization status required by the control center, Ambes participated in the construction of the main control room, laying a solid foundation for the informationization construction of the command center, promoting the later development to break through institutional and mechanistic bottlenecks, improving the policy support system for expanding domestic demand, and substantially implementing the expansion of domestic demand. On the LED screen in the main control room, the digital converter station panoramic video fusion system is running. The system can display visible light images of the entire station equipment in a single image, synchronously displaying operating condition information such as infrared temperature measurement data of the converter transformer square, DC field, and converter valve.

Due to the shift in annual inspection time, after the completion of this maintenance work, the project will face the test of long-term operation conditions of "one and a half years" for the first time. Digitization will provide important impetus for the continuous operation of the Lingshao DC project.

Recommend

027-86578008

4虎影院在线观看-4虎在线-成人性生活视频-成人性生交大免费看-黄色av一级片-黄色av一区-免费精品久久-免费精品视频-日韩 国产 欧美-日韩 国产 在线-午夜啪视频-午夜琪琪-在线免费三级-在线免费色-一区二区三区高清日本vr-中国偷拍老肥熟露脸视频
  • <bdo id="cayak"><source id="cayak"></source></bdo>
  • <center id="cayak"></center>
    <button id="cayak"></button><code id="cayak"><tr id="cayak"></tr></code>
  • <code id="cayak"><acronym id="cayak"></acronym></code>
    主站蜘蛛池模板: 98精品国产自产在线观看| 亚洲石原莉奈一区二区在线观看| 97免费在线视频| 欧美中文字幕视频在线观看| 国产91精品久久久久久久| 国产精欧美一区二区三区| 国产欧美一区二区三区视频 | 日韩国产精品一区| 亚洲精品在线看| 日韩在线视频免费观看高清中文| 欧美另类高清videos| 97精品视频在线| 成人激情视频在线观看| 亚洲人成在线观| 精品av在线播放| 7m精品福利视频导航| 亚洲一区二区三区xxx视频| 亚洲精品视频在线播放| 欧美wwwwww| 日韩av免费在线| 亚洲欧美福利视频| 福利一区视频在线观看| 国产精品第1页| 一区二区三区美女xx视频| 日韩欧美中文字幕在线播放| 国产精品电影在线观看| 亚洲视频在线观看| 久久人人看视频| 亚洲成人性视频| 岛国精品视频在线播放| 成人亲热视频网站| 久久激情视频久久| 日韩美女视频免费在线观看| 亚洲精品综合精品自拍| 久久久视频在线| 日韩av在线一区| 91国内在线视频| 亚洲视频电影图片偷拍一区| 性色av一区二区三区红粉影视| 亚洲第一精品夜夜躁人人躁| 欧美日韩中文字幕综合视频|